IML Tree Inspection App (iOS & Android)

The IML Tree Inspection App is the perfect mobile complement to the IML Tree Inspection software. Available for Android and iOS, it offers professionals maximum flexibility in tree inspection. With its intuitive operation and seamless integration into the IML Cloud, the app enables mobile data collection, documentation and synchronization directly on site.

Callback service

Do you have questions?

    Detailed information on handling user data can be found in our privacy policy.

    Description

    The app was specially developed to expand the possibilities of tree diagnostics. It enables photos, GPS data and notes to be captured directly in the field and seamlessly integrated into existing projects. Sensors in the mobile device offer additional functions such as measuring the heights of the tree and measurement levels. Real-time synchronization with the IML Cloud ensures that all data is always up to date.

    Range of functions:

    • Integration into the IML Cloud
      Projects can be synchronized directly between mobile devices and the PC software
    • Documentation
      Photos, GPS data and comments can be easily recorded and linked to projects
    • Sensor integration
      Camera and tilt sensors in the mobile device support the measurement of tree heights and measurement levels
    • User-friendliness
      Intuitive operation ensures simple and efficient use

    Areas of application:

    • Carrying out mobile tree inspections and data collection on site
    • Supplementing existing tree projects with visual and georeferenced data
    • Support smooth collaboration between surveyors in the field and office staff.

    Compatibility:

    • Available for Android and iOS
    • Works with PiCUS Sonic Tomograph 3 (sonic tomographs) and Calliper 3 that support Bluetooth Low Energy (as does the PC software)
    • Seamlessly connects with IML Tree Inspection software for a consistent workflow

    Conclusion:

    The IML Tree Inspection App is the ideal solution for professionals who want to work on the move. It extends the functionality of the PC software and enables quick and easy data collection directly in the field. Thanks to integration into the IML Cloud, users benefit from an efficient, networked way of working.

    Mobile App Compatibility

    Not all older PiCUS Sonic Tomographs and PiCUS Callipers are compatible with the new IML Tree Inspection App. Compatibility requires a Bluetooth Low Energy capable wireless module. Use the tables below to check your device compatibility:

    PiCUS Sonic Tomograph 3

    Version information can be found in the tomograph under Settings → Updates.

    Version display PiCUS Sonic Tomograph 3
    Hardware Version Firmware Version Compatibility
    26, 27, 28, 29 Rev 27 Fully compatible
    26, 27, 28, 29 Rev 26 or older Firmware upgrade required
    22, 23, 24, 25 with NINA B2 module Rev 26 or older Firmware upgrade required
    22, 23, 24, 25 with Bluemod B20 module Hardware and firmware upgrade required (device must be sent in)

    PiCUS Calliper 3

    Version information is available in the Calliper under the Info menu (Firmware version is located in the first part of the serial number: PCA.XX-00000).

    Version display PiCUS Calliper 3
    Hardware Version Firmware Version Compatibility
    42, 43, 44 Rev 31 Fully compatible
    42, 43, 44 Rev 30 or older Firmware upgrade required
    41 Not compatible

    Unlike the mobile app, the PC version of the IML Tree Inspection Software also supports Bluetooth Classic and USB. It is fully compatible with all 3rd generation Sonic Tomographs and Callipers.

    PiCUS Sonic Tomographs 1 / 2 and PiCUS Callipers 1 / 2 are generally not compatible with the IML Tree Inspection Software and App.